EasyManua.ls Logo

Fronius CU 1800 - Page 109

Fronius CU 1800
146 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
109
4. Fill in cooling liquid, until the H marking is reached again.
5. Press both ARROW buttons simultaneously again: RESET function.
The alarm gets reset.
The ALARM indicator LED goes out.
The uid level indicator goes out.
6. Press the buttons RUN/STOP and MENU simultaneously again: PUMP function.
The pump is put into operation.
The RUN indicator LED ashes green.
7. If necessary, repeat steps 1 to 6, until the cooling circuit is lled with cooling liquid.
Filling the coo-
ling circuit
(continued)

Table of Contents

Related product manuals