EasyManua.ls Logo

Fronius TransSynergic 5000 - TIG Welding Procedure

Fronius TransSynergic 5000
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
114
1. Fit capacitors (7), including grommets (8), in place (Fig.5)
2. Hold capacitors in place and fit using capacitor nuts (6) (Fig.7)
Fitting intermedi-
ate circuit capa-
citors
Important! After removing a capacitor (7), its grommets (8) - Fig.5 - can either
- adhere to the front of the capacitor (7)
- remain on the partition (9) inside the power source
- be disposed of
NOTE! When fitting the capaci-
tors, ensure that the grommets
(8) are arranged correctly, as
shown in Fig.5.
Fig.6 Putting capacitors in place Fig. 7 Fitting capacitors
(7)
(6)
Fit the following elements using capacitor screws (5):
1. Capacitor leads „ELKO1+“ to „ELKO2-“
2. Connecting lead (10)
Fig. 8 Connecting leads
(5)
(5)
(7)
Fig.5 Fitting capacitors
Fig 9 Installing capacitor
+
-
+
-
(5)
„ELKO1-“
„ELKO2+“
„ELKO1+“
„ELKO2-“
(10)
(7) (8) (6)
(5)
(5)
(5)
(9)

Table of Contents

Other manuals for Fronius TransSynergic 5000

Related product manuals