EasyManua.ls Logo

Fujitsu AIRSTAGE J-IIIL - Page 161

Fujitsu AIRSTAGE J-IIIL
904 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
¢
Installation space requirement
Provide sufficient installation space for product safety.
5-7/8 (150)
or more*
15-3/4 (400)
or more
Unit: in (mm)
Strong and durable ceiling
Indoor unit
*: 15-3/4 (400) or more when drain from drain pipe
Right
side
Left
side
When intaking air from back:
Service access Ceiling
98-7/16 (2,500) or more
(When no ceiling)
Floor
8-7/8 (225) or more
3/16 (5) or more
13/16 (20) or more
11-13/16 (300) or more
Air
When intaking air from bottom:
3-15/16 (100) or more
Air
¢
M
aintenance space requirement
For future maintenance and service access, provide sufficient maintenance space.
NOTE: Do not place any wiring or illumination in the maintenance space, as they will impede ser-
vice.
Unit: in (mm)
Top view
Service access
Ai
r
Air
Control box
15-3/4 (400) or more
3-15/16 (100)
or more
11-13/16 (300) or more*
Service space
*: More than 3-15/16 (100) when intaking air from bottom
4-4. Mini duct type - (04-37) - 4. Dimensions
INDOOR
UNITS
INDOOR
UNITS

Table of Contents

Related product manuals