2-5. Additional charge calculation
NOTES:
The outdoor unit is charged refrigerant at the factory.
Additional refrigerant required to be charged on site depending on pipe length and outdoor unit
model.
The additional refrigerant charge amount is calculated according to the following formula.
Round up the calculated result to two decimal places.
¢
Calculation formula
Calculation of additional amount for pipe length (A)
Diameter of liquid pipe a: Additional amount for pipe length
in (mm) lb/ft (kg/m)
Ø1/4 (6.35) 0.014 (0.021)
Ø3/8 (9.52) 0.039 (0.058)
Ø1/2 (12.70) 0.077 (0.114)
A =
Total length of
Ø1/2 in
(12.70 mm)
liquid pipe
a:
× 0.077 lb/ft
(0.114 kg/m)
+
Total length of
Ø3/8 in (9.52 mm)
liquid pipe
a:
× 0.039 lb/ft
(0.058 kg/m)
+
in (mm) in (mm)
lb (kg) lb (kg)
Total length of
Ø1/4 in (6.35 mm)
liquid pipe
a:
× 0.014 lb/ft
(0.021 kg/m)
=
Total
in (mm)
lb (kg)
lb (kg)
A =
lb (kg)
Round up A to 2 decimal place.
Factory charge amount (B)
Model name Ton b: Factory charged amount
AOU72RLAVL 6
24.25 lb (11.0 kg)AOU96RLAVL 8
AOU120RLAVL 10
B =
b: Outdoor unit
Factory charge amount
lb (kg)
2-5. Additional charge calculation - (06-26) - 2. Piping design
SYSTEM
DESIGN