Leak pressure test
• Pressurize system with 609 psi (4.2 MPa) nitrogen
• System must hold 600 psi for a minimum of 24
hours.
↓
Vacuum evacuation and drying
• Do not purge system with refrigerant.
• Use a vacuum pump with check valve to prevent the
back flow of vacuum pump oil into the refrigerant
system.
↓
Additional refrigerant charge
Calculate additional refrigerant charge. Add additional re-
frigerant with R410A gage manifold and hose.
↓
Gas leakage check
↓
Outside panel installation
↓
Test run and adjustment
End of work
↓
Hand over
↓