When performing apportionment calculation using electricity meter
The electricity meter shall be connected to the necessary air conditioners which are the target of
calculation by the electricity charge apportionment function.
When an electricity meter is not connected, electricity charge apportionment calculation using
an electricity meter may not be possible.
[Electricity charge apportionment with outdoor unit only]
--> Connect the electricity meter to the outdoor unit.
Electricity meter is not connected to
o
utdoor unit
Whm
[Outdoor unit + indoor unit electricity charge apportionment]
--> Connection of an electricity meter to the outdoor unit and indoor unit is necessary.
Electricity meter is not connected to
some indoor units
Electricity meter is connected to outdoor unit only
even though outdoor unit + indoor unit electricity
charge apportionment is performed
Whm
Whm
Whm
2-26. Electricity charge apportionment setting (System controller, Touch panel
controller)
- (07-147) - 2. Function settings