Step included Explanation
Transport no
Returning the server to its installation site
(where required) depends on local
customer conditions.
Assembly, rack
installation
yes
Reassembling the server, installing the
server in the rack (if applicable).
Starting up no
Booting time depends on hardware and
software configuration and may vary
significantly.
Table 1: Calculation of the average task duration
2.4 T
ools you need at hand
When preparing the maintenance task, ensure that all required tools are
available. You will find a list of required tools at the beginning of each
procedure.
2.5 Documentation overview
2.5.1 About availability of manuals
Maintenance procedures may include references to additional documentation.
When preparing the maintenance task, ensure that all required manuals are
available, see 2.5.2.
Ensure to store all printed manuals enclosed with your server in a save
place for future reference.
Unless stated otherwise, all manuals are available online at:
https://support.ts.fujitsu.com/
For Japan:
https://www.fujitsu.com/jp/products/computing/servers/primergy/manual/
Before you start
22 Upgrade and Maintenance Manual TX1310 M5