EasyManua.ls Logo

Gasboy Islander Prime - 4 - Preliminary Guidelines; 4.1 General; 4.2 Precautions and Safety Notes; 4.3 Station Survey

Gasboy Islander Prime
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MDE-5411A ForeHB Islander Prime Installation Manual · October 2018 Page 21
4.1 General Preliminary Guidelines
4 – Preliminary Guidelines
4.1 General
This section provides preliminary guidelines for Islander Prime. These include:
Preliminary instructions
Wiring and wire conduits requirements
Installation procedures and requirements depend on the
specific fuel dispenser models and
the site layout. Therefore, use the information in this section to develop installation plans
for each specific installation.
Since installation requirements vary from case to
case, no installation hardware is supplied
by the equipment manufacturer, and installation planners must develop their own
requirements.
It is the customers responsibility to provide an installation plan designed by an authorized
engineer
, and ensure that it adheres to all local standards. This plan design should reflect
the existing electric infrastructure of the site.
Perform a site survey of the station prior to installation.
TIP
4.2 Precautions and Safety Notes
Précautions et consignes de sécurité
Prior to any installation activities, carefully observe the precautions and safety notes below.
Avant toute activité d'installation, observez avec soin les précautions et les consignes de
sécurité ci- dessous.

Table of Contents

Related product manuals