EasyManuals Logo

GE MAC 1200 ST Operator's Manual

GE MAC 1200 ST
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #117 background imageLoading...
Page #117 background image
Revision C MAC 1200/1200 ST 8-21
2012250-021
Stress Tests: Running a Stress Test
Ending the Stress Test
For automatically controlled program sequences, press the
after completing the last stage in the last phase to end the stress test. Refer
to “End/Cancel a Stress Teston page 8-7 for more information.
127(
If the stress test is aborted in the pretest phase with , no
automatic final report will be printed.

Table of Contents

Other manuals for GE MAC 1200 ST

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE MAC 1200 ST and is the answer not in the manual?

GE MAC 1200 ST Specifications

General IconGeneral
BrandGE
ModelMAC 1200 ST
CategoryMedical Equipment
LanguageEnglish

Related product manuals