EasyManua.ls Logo

GE Venue R2

GE Venue R2
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8-30 Section 8-4 - System Modules- Replacement Procedures
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
8-4-2-5 Front End Metal Door Installation
1.) Install the new FE Door assembly.
2.) Install the riser thermal cover.
3.) Secure the Full FE Module to the FE Door with four screws (previously removed).
4.) Mount the FE Door assembly on the scanner.
5.) Reconnect the following cables:
PCIe cable
MPB TO T-FEPS Cable and secure it to the CFE module and to the T-FEPS module with cable
clips.
Fan cable
6.) Close the FE door and close the two fastening latches on the left side of the Front End door
assembly.
7.) Tighten the captive screw.
8.) Refit the following covers: Mid Thermal Baffle Cover, Lower Front eTower, left side eTower, right
side eTower and RS Probe Cover.
9.) Install all accessories.
10.)Turn ON power to the system.
Riser Thermal Cover Installation Procedure
Mid Thermal Baffle Cover Installation Procedure
Left Side eTower Cover Installation Procedure
Right Side eTower Cover Installation Procedure
Lower Front eTower Cover Installation Procedure
RS Probe Cover Installation Procedure
Accessories - Replacement Procedures
Perform the checks listed in Front End Metal Door Replacement on page 8-216

Table of Contents

Related product manuals