EasyManua.ls Logo

GE Venue R2

GE Venue R2
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
3-22 Section 3-5 - Completing the Setup
PRELIMINARY
Section 3-5
Completing the Setup
3-5-1 Purpose of this Section
This section describes how to complete the setup of the Venue™.
3-5-2 System Specifications
3-5-2-1 System Requirements Verification
Verify that the site meets the requirements listed in Chapter 2.
(See: Facility Needs on page 2 - 7.)
Verify that the specifications below do not conflict with any on-site conditions.
3-5-2-2 Physical Dimensions
3-5-2-3 Mass with Monitor and Peripherals
3-5-2-4 Acoustic Noise Level
Less than 55 dB(A) at 20 degrees Celsius, measured in the operators head position, 20 cm in front of
the keyboard’s right corner, at 1.30 m above the floor, and in a distance of 1 meter at all four sides, 1
meter above the floor.
3-5-3 Electrical Specifications
3-5-3-1 Verification of the Venue™ Voltage Setting
Verify that the mains voltage specified for the Venue™ is available on-site.
The voltage setting for the Venue™ is found on a label near the Mains Power Circuit Breaker on the
rear of the Venue™ .
3-5-3-2 Electrical Specifications for the Venue
In the table below, the electrical specifications for Venue™ includes monitor and on board peripherals.
Table 3-12 Physical Dimensions of Venue™ with Monitor and Peripherals
in Transportation Position
Height Width Depth Unit
131 48 72.5 cm
51.57 18.89 28.54 Inches
Table 3-13 Mass of Venue™ with Cockpit (monitor), without Probes and Peripherals
Model Mass [KG] Mass [LBS]
Venue™ 63 139
WARNING
WARNING
Connecting a Venue™ to the wrong voltage level will most
likely destroy it.

Table of Contents

Related product manuals