EasyManua.ls Logo

GE Venue R2

GE Venue R2
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 8 - Replacement Procedures 8-173
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
8-8-3 ECG Installation Procedure for Systems with No Printer Installed
8-8-3-1 Tools
Appropriate Phillips screwdriver
8-8-3-2 Time Required
15 min
8-8-3-3 Preparations
1.) Shut down the Venue™ ultrasound unit, as described in Power Shut Down .
2.) Make sure the On/Off power switch is set to Off.
3.) Make sure the system is standing securely on a level surface, with the wheels in the locked position.
8-8-3-4 ECG Installation
1.) Remove the following covers: Lower Front eTower, Upper Front eTower, and MPB Front Metal
Door, Printer Insert Cover.
2.) Replace the printer insert cover with the one provided in the ECG installation kit.
FRU Part #
Refer to Table 9-20 on page 9-19.
Lower Front eTower Cover Removal Procedure
Upper eTower Front Cover Removal Procedure
MPB Front Metal Door Removal Procedure
Printer Insert Cover Removal Procedure
Figure 8-185 Replacing Printer Insert Cover

Table of Contents

Related product manuals