EasyManua.ls Logo

GE Venue R2

GE Venue R2
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8-108 Section 8-6 - Mechanical Parts- Replacement Procedures
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
Section 8-7
Cables - Replacement Procedures
8-7-1 MPB Rear USB Cable Replacement Procedure
8-7-1-1 Tools
Appropriate Phillips screwdriver.
8-7-1-2 Time Required
10 min
8-7-1-3 Preparations
1.) Shut down the Venue™ ultrasound unit, as described in Power Shut Down .
2.) Make sure the On/Off power switch is set to Off.
3.) Make sure the system is standing securely on a level surface, with the wheels in the locked position.
8-7-1-4 MPB Rear USB Cable Removal Procedure
1.) Remove all accessories.
2.) Remove the following covers: Lower Front eTower, Left side eTower, and Right Side eTower,
3) Remove MPB Front Metal Door.
4.) Remove the battery packs to gain access to the MPB module.
5.) Remove the PSU module.
6.) Unscrew the two mounting screws and remove the MPB module.
FRU Part #
Refer to Table 9-14 on page 9-14.
Accessories - Replacement Procedures
RS Probe Cover Removal Procedure
Lower Front eTower Cover Removal Procedure
Left Side eTower Cover Removal Procedure
Right Side eTower Cover Removal Procedure
MPB Front Metal Door Removal Procedure
Battery Module Removal Procedure
PSU Module Removal Procedure
MPB Module Removal Procedure

Table of Contents

Related product manuals