EasyManua.ls Logo

GE Venue R2

GE Venue R2
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8-164 Section 8-8 - Peripherals Replacement/Installation Procedures
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
Section 8-8
Peripherals Replacement/Installation Procedures
8-8-1 Printer Replacement/Installation Procedure
8-8-1-1 Tools
Appropriate Phillips screwdriver
8-8-1-2 Time Required
10 min
8-8-1-3 Preparations
1.) Shut down the Venue™ ultrasound unit, as described in Power Shut Down .
2.) Make sure the On/Off power switch is set to Off.
3.) Make sure the system is standing securely on a level surface, with the wheels in the locked position.
8-8-1-4 Printer Removal Procedure
NOTE: Perform these steps only for Venue™ systems with printer already installed on them. For
systems with no previously installed printer, skip this section and proceed to section Printer
Installation Procedure (For Systems with No Existing Printer)
1.) Remove all accessories.
2.) Remove the following covers: RS Probe Cover, Lower Front eTower, Left side eTower, Right Side
eTower, Upper eTower Front Cover.
FRU Part #
Refer to Table 9-19 on page 9-18.
Accessories - Replacement Procedures
RS Probe Cover Removal Procedure
Upper eTower Front Cover Removal Procedure
Lower Front eTower Cover Removal Procedure
Left Side eTower Cover Removal Procedure
Right Side eTower Cover Removal Procedure

Table of Contents

Related product manuals