Chapter 8 - Replacement Procedures 8-93
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
8.) Remove four securing screws and remove the riser.
8-6-5-5 Riser Installation Procedure
1.) Install new riser on the eTower.
2.) Apply LOCTITE® 243™ on the riser securing screws and tighten the screws.
3.) Install the Teflon sliding top ring.
4.) Remove the masking tape holding the pressure pin; ensure the pin is not dropped
Figure 8-78 Removing Riser
Figure 8-79 Installing Teflon Sliding Top Ring
Figure 8-80 Pressure Pin