EasyManua.ls Logo

GE Venue R2 - Page 466

GE Venue R2
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10-8 Section 10-3 - Why Do Maintenance?
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
10-5-2-2 Peripheral/Option Checks
If any peripherals or options are not part of the system configuration, the check can be omitted.
Refer to the Venue™ User Manual for a list of approved peripherals/options.
10-5-2-3 Mains Cable Inspection
Table 10-6 GE Approved Peripheral/Hardware Option Functional Checks
Step Item Description
1
Media Verify media drive(s) read/write properly.
2
B/W Printer Verify hardcopy output of the B/W video page printer. Clean heads and covers if necessary.
3
DICOM Verify that DICOM is functioning properly. Send an image to a DICOM device.
4
ECG Verify basic operation with customer.
Table 10-7 Mains Cable Inspection, As Appropriate
Step Item Description
1
Unplug Cord Disconnect the mains cable from the wall outlet and from the Ultrasound system.
2
Inspect Inspect the mains cable and its connectors for any damage.
3
Verify
Verify that the LINE, NEUTRAL and GROUND wires are properly attached to the terminals,
and that no strands may cause a short circuit.
4
Verify Verify that the Inlet connector retainer is functional.

Table of Contents

Related product manuals