GM Energy V2H Bundle Installation Manual 13
Installation Outline
GM Energy PowerShift Charger Only Install
For installation of the Charger only, please see the GM Energy PowerShift Charger Installation Manual available at
https://gmenergy.gm.com/for-home/installation-support
GM Energy V2H Bundle Install (GM Energy PowerShift + V2H Enablement Kit)
Your actual sequence may vary based on site conditions and chosen workflow. The Hub and the Inverter have usable
knockouts pre-drilled—you may NOT create any additional knockouts in the Hub or in the Inverter.
1. Attach mounting brackets to wall.
2. Mount equipment on brackets.
3. Remove equipment covers.
4. Prepare knockouts for raceways.
5. Install conduit (or bundled cables) between all equipment.
6. Install and terminate power conductors, communication cables, and control cables.
7. Migrate existing circuits into the Hub.
8. Verify that equipment is adequately secured to mounting surfaces, conduits appropriately sealed, and conductors
and cables terminated properly.
9. Safeguard equipment for energization.
10. Conduct and record pre-commissioning checks and data.
11. Commission the equipment.
12. Verify all premises circuits are operational.
13. Reinstall all equipment covers and beauty covers.
14. Orient customer with equipment and any next steps.