140
11 - HEAT CIRCUIT 2
12 - H
EAT CIRCUIT 3
13 - H
EAT CIRCUIT 4
14 - H
EAT CIRCUIT 5
15 - H
EAT CIRCUIT 6
16 - D
OMESTIC HOT WATER 1
10-23 Heat circuit 1
Hold time
Screed drying
(4) 4 d
• Holding time for screed drying
Set the time to maintain the maximum supply tempera-
ture during screed drying.
(0 - 20 d)
10-24 Start screed drying
no
yes
• Preselected screed drying program is started.
No. Display Description
Table 6/12 - System level / 10 - Heating circuit 1
The layout of the parameter structure in service level 11-Heat
circuit 2 is identical to service level 10-Heat circuit 1.
The layout of the parameter structure in service level 12-Heat
circuit 3 is identical to service level 10-Heat circuit 1.
The parameter groups 13-Heat circuit 4, 14-Heat cir-
cuit 5 and 15-Heat circuit 6 are only available if an addi-
tional heating circuit module is installed.
The layout of the parameter structure in service levels 13, 14, and 15
are identical to service level 10-Heat circuit 1.
No. Display Description
16-01 DHW 1
Set temperature
( 60) 60°
• Preset temperature for the hot water tank
Set the temperature of the hot water tank.
(20 - 100 °C)
16-02 Prog. 1 DHW1
Mo Tu We Th Fr Sa Su
On 00:00 On 00:00
Off 24:00 Off 00:00
• Heating times for the hot water tank
Time block 1: Various enable times can be defined for the
individual days of the week.
✎ See page 104.
16-03 Prog. 2 DHW1
Mo Tu We Th Fr Sa Su
On 00:00 On 00:00
Off 00:00 Off 00:00
• Heating times for the hot water tank
Time block 2: Various enable times can be defined for the
individual days of the week.
✎ See page 104.
Table 6/13 - System level / 16 - Domestic hot water 1