6 Using the heating system – Filling the fuel bunker
107
6.8 Filling the fuel bunker
REQUIREMENTS
The following requirements must be met before the fuel bunker can
be filled.
The fuel bunker must have initially been approved by an autho-
rised specialist.
The fuel bunker must be dry and free of any foreign bodies.
The requirements of government safety organisations must be
met.
PROCEDURE FOR FILLING WITH WOOD FUEL PRODUCTS
1. Turn the heating system main switch on.
The control is activated.
See section “6.2 Switching on the heating system” in this chapter.
2. Check whether the delivery system is running.
Combustion chamber
temperature stop
The maximum permitted temperature in the combus-
tion chamber has been exceeded.
The heating system waits until the combustion cham-
ber falls back below the maximum permitted tempera-
ture.
frost protection The main switch is turned on.
Frost protection and the protective programs are
active.
This operating status is maintained until a change is
made to a different status.
Domestic hot water Together with the HDG Hydronic heating circuit con-
trol, it is possible to implement summer operation.
In this mode the anti-frost and protective functions are
active.
Only hot water is heated.
Boiler switched off The main switch has been turned off.
All functions are disabled.
Operating status
Operating
mode
Description
Table 6/1 - Operating statuses