61
INSTALLING THE AUTOMATIC ASH REMOVAL SYSTEM -
HDG COMPACT 45/50/65/80
1. Release the lower M10 screw (size 17) (1).
2. Remove both sealing plates using a 17 mm spanner (2) on the
front and rear of the boiler.
3. Remove the four M8 screws (size 13) (3).
I
NSTALLING THE ASH PLATE
5. Slide the ash plate (3) from the front into the ash compartment (4).
6. Tighten the ash plate (3) with the M10 screw (size 17) (5).
7. Mount the alignment plate (1) on the ash plate (3) with the two
M10 screws (2), without however tightening the screws.
Figure 4/23 - Removing the sealing plates
4. Remove the alignment plate
(3) from the ash plate (1) using
a 17 mm spanner.
Figure 4/24 - Removing the alignment plate