6-2
•
•
1. Load the machine so that the machine width center
aligns with the trailer deck width center.
2. Slowly drive the machine on the ramp.
3. Lower the bucket onto the trailer deck.
4. Stop the engine. Remove the key from the key switch.
5. Operate the loader control lever several strokes to relieve
pressure in the cylinders.
6. Place the pilot control shut-off lever in the LOCK position.
7. Securely close the windows and cab door to protect the
cab from rain. Put a cover over the opening of the ex
-
haust pipe.
8. Install the articulation lock bar (1) to prevent the machine
from articulating.
M4GB-01-136
Front
Attachment Side