EasyManua.ls Logo

HP 9000 Superdome - Page 145

HP 9000 Superdome
260 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 6
Troubleshooting and Installation-Related Tasks
Installing a PCI I/O Card While the Cell is Off
121
5. Enter the same cabinet and slot information you entered in step 3d above.
6. Enter on.
It takes 2-4 minutes to power on the cell and all of the PCI card slots in the card cage. Green
lights in the card cage will power on for each slot in a predefined order.
7. Check that the green LED on the cell board and the green LEDs on the card cage are on.
Step 9. Verify the PCI card installation. See “Verifying the PCI Card Installation” on page 96.

Table of Contents

Related product manuals