EasyManua.ls Logo

HP 9000 Superdome - Checking the Superdome Inventory

HP 9000 Superdome
260 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2
Unpacking and Inspecting
Checking the Superdome Inventory
12
Checking the Superdome Inventory
The Sales Order Packing Slip lists all equipment shipped from Hewlett-Packard. Use this packing slip to
verify that all equipment has arrived at the customer site.
NOTE To identify each item by part number, refer to the Sales Order Packing Slip.
One of the large overpack containers is labeled “Open Me First.” This box contains the Solution Information
Manual and DDCAs. Unpacking Instructions are in the plastic bag taped to the System Processing Unit
(SPU).
The following items are in other containers and should be checked against the packing list:
Power Distribution Control Assembly (PDCA) and power cord
Two blower housings per SPU cabinet
Four blowers per SPU cabinet
Four side skins with related attachment hardware
SPU blower bezels and front door assemblies
Support Management Station (if ordered)
Cables
Optional equipment
Boot device with HP-UX installed, if ordered
Bay Connect Kit (for the Superdome 64 Way)

Table of Contents

Related product manuals