Chapter 2
Unpacking and Inspecting
Checking the Superdome Inventory
12
Checking the Superdome Inventory
The Sales Order Packing Slip lists all equipment shipped from Hewlett-Packard. Use this packing slip to
verify that all equipment has arrived at the customer site.
NOTE To identify each item by part number, refer to the Sales Order Packing Slip.
One of the large overpack containers is labeled “Open Me First.” This box contains the Solution Information
Manual and DDCAs. Unpacking Instructions are in the plastic bag taped to the System Processing Unit
(SPU).
The following items are in other containers and should be checked against the packing list:
• Power Distribution Control Assembly (PDCA) and power cord
• Two blower housings per SPU cabinet
• Four blowers per SPU cabinet
• Four side skins with related attachment hardware
• SPU blower bezels and front door assemblies
• Support Management Station (if ordered)
• Cables
• Optional equipment
• Boot device with HP-UX installed, if ordered
• Bay Connect Kit (for the Superdome 64 Way)