EasyManua.ls Logo

HP 9000 Superdome - Unpacking the PDCA

HP 9000 Superdome
260 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2
Unpacking and Inspecting
Unpacking the PDCA
26
Unpacking the PDCA
At least one Power Distribution Control Assembly (PDCA) is shipped with the Superdome. In some cases, the
customer may have ordered two PDCAs, the second to be used as a backup power source. Unpack the PDCA
now and ensure it has the power power cord option for your installation.
Currently there are several power cord options available for the PDCAs. These are shown in Table 2-1. Only
options 6 and 7 are currently available in new superdome configurations. The other options shown in
Table 2-1 are obsolete but are given in case you encounter a Superdome with obsolete power cord options.
Table 2-2 details options 4 through 7.
Table 2-1 Available Power Options
Option
a
Source
Type
Source Voltage
(nominal)
PDCA
Required
Input Current
Per Phase
200-240 VAC
b
Power Receptacle
Required
1
c
3-phase Voltage range
200-240 VAC,
phase-to-neutral,
47-63 Hz
(EUR typical)
d
five-wire 25A Maximum
per phase
No receptacle required.
Electrician must hardwire
power to the PDCAb
2
e
3-phase Voltage range
200-240 VAC,
phase-to-phase,
47-63 Hz
(US typical)
four-wire 44A Maximum
per phase
No receptacle required.
Electrician must hard-wire
power to the PDCAb
4
f
3-phase Voltage range
200-240 VAC,
phase-to-phase,
47-63 Hz
four-wire 44A Maximum
per phase
Connector and plug
provided with a 2.5-meter
power cable. Electrician
must hard-wire receptacle to
100A site power.b,
g
5
h
3-phase Voltage range
200-240 VAC,
phase-to-neutral,
47-63 Hz
five-wire 25A Maximum
per phase
Connector and plug
provided with a 2.5-meter
power cable. Electrician
must hard-wire receptacle to
63A site power.b,d
6 3-phase Voltage range
200-240 VAC,
phase-to-phase,
47-63 Hz
four-wire 44A Maximum
per phase
Connector and plug
provided with a 2.5-meter
power cable. Electrician
must hard-wire receptacle to
60A site power.b,d
7 3-phase Voltage range
200-240 VAC,
phase-to-neutral,
47-63 Hz
five-wire 25A Maximum
per phase
Connector and plug
provided with a 2.5-meter
power cable. Electrician
must hard-wire receptacle to
32A site power.b,d

Table of Contents

Related product manuals