EasyManua.ls Logo

HP 9000 Superdome - Using the Checklist

HP 9000 Superdome
260 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix B
Installation Checklist
Using the Checklist
150
Using the Checklist
The checklist provided here is an installation aid and should be used only after you have installed a few
systems using the detailed procedures described in the body of this manual. This checklist is a compilation of
the tasks described in this manual.
The checklist is organized as follows:
PROCEDURES The procedures outlined in this document in order.
IN-PROCESS The portion of the checklist that allows you to comment on the current status of a
procedure.
COMPLETED The final check to ensure that a step has been completed and comments.
Major tasks are in bold type, subtasks are indented.
Table B-1 Factory-Integrated Installation Checklist
PROCEDURE IN-PROCESS COMPLETED
Initials Comments Initials Comments
Chapter 2
Gather LAN information
Verify site preparation
Site grounding verified
Power requirements
verified
Check inventory
Inspect shipping containers
for damage
Unpack SPU cabinet

Table of Contents

Related product manuals