Chapter 3
Preparing Superdome for Booting
Installing and Verifying the PDCA
47
Installing and Verifying the PDCA
All Superdomes are delivered with the appropriate cable plug for Options 6 and 7. The mating receptacle
connector is not provided as with Options 4 and 5.
Check the voltages at the receptacle prior to plugging in the PDCA plug. Refer to Figure 3-15 and Figure 3-16
on page 49 for pin locations.
• To verify the proper wiring for a four-wire PDCA, use a DVM to measure the voltage at the receptacle.
Voltage should read 200 - 240 Vac phase-to-phase as measured between the receptacle pins as follows: L1
to L2, L2 to L3, L1 to L3.