Chapter 2
Unpacking and Inspecting
Unpacking and Inspecting Superdome Hardware Components
17
Step 1. Position the packaged SPU cabinet so that a clear area about three times the length of the package
(about 12 feet) is available in front of the unit, and at least two feet are available on the sides.
Figure 2-3Front of SPU Cabinet Container
Step 2. Cut the plastic polystrap bands around the shipping container.
5/31/00
60IN011A
Label