IDS1000-A Air-Cooled Container Data Center
All-in-One Maintenance Guide
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Document required: initial configuration parameters for the management system
Skill requirement: weak-current engineer
Procedure
Step 1 Remove the baffle plate for the access card reader using a Phillips screwdriver as shown in
Figure 5-28.
Figure 5-28 Removing the access card reader baffle plate
Step 2 Remove the screws from the access card reader support using an adjustable wrench as shown
in Figure 5-29.
Figure 5-29 Removing screws