Table B-2 Denition of the stripping length of cables for a parallel box (parallel system scenario)
No. One End Other End 1 2
1 AC parallel
box
PDC
customer
side
L wire: 120 mm
N wire: 120 mm
PE wire: 140 mm
L wire: 16 mm
N wire: 14 mm
PE wire: 14 mm
2 AC parallel
box
AC input L wire: 410 mm
N wire: 340 mm
PE wire: 240 mm
L wire: 12 mm
N wire: 7 mm
PE wire: 7 mm
3 AC parallel
box
AC output L wire: 115 mm
N wire: 220 mm
PE wire: 370 mm
L wire: 12 mm
N wire: 7 mm
PE wire: 7 mm
4 AC parallel
box
PDB
customer
side
L wire: 300 mm
N wire: 325 mm
PE wire: 580 mm
L wire: 16 mm
N wire: 14 mm
PE wire: 14 mm
5 AC parallel
box
Ground bar
customer
side
N/A 14 mm
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1) B Preparing the Cable and Terminal
Issue 01 (2022-07-15) Copyright © Huawei Technologies Co., Ltd. 188

Table of Contents

Related product manuals