EasyManua.ls Logo

Huawei iSitePower-M V100R002C00 - Page 77

Huawei iSitePower-M V100R002C00
197 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
No. One End Other End Type Recommended
Specications
4 Ground
point
Ground bar
customer
side
Outdoor single-core
copper cable
Main ground cable: 4–6
mm
2
(same as the cross-
sectional area of the AC
input power cable)
5 Ground
point
Ground point
on the
module for
capacity
expansion
Outdoor single-core
copper cable
Main ground cable: 6 mm
2
Table 7-10 Cables in parallel system scenario
No. One End Other End Type Recommended
Specications
1 PV input
ports
DC switch
customer
side
Common outdoor PV
cable in the industry
Conductor cross-
sectional area: 4–6 mm
2
Cable outer diameter:
5.5–9 mm
2 Ground
point
Ground bar
customer
side
Outdoor single-core
copper cable
Main ground cable: 4–6
mm
2
(same as the cross-
sectional area of the AC
input power cable)
3 AC parallel
box
PDB
customer
side
Outdoor three-core copper
cable (L/N/PE)
Conductor cross-
sectional area: 25 mm
2
Cable outer diameter:
16–26 mm
4 AC parallel
box
AC output Outdoor three-core copper
cable (L/N/PE)
Conductor cross-
sectional area: 4–6 mm
2
Cable outer diameter:
13.7–16.9 mm
5 AC parallel
box
AC input Outdoor three-core copper
cable (L/N/PE)
Conductor cross-
sectional area: 4–6 mm
2
Cable outer diameter:
13.7–16.9 mm
6 AC parallel
box
PDC
customer
side
Outdoor three-core copper
cable (L/N/PE)
Conductor cross-
sectional area: 25 mm
2
Cable outer diameter:
16–26 mm
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1) 7 Preparing Cables
Issue 01 (2022-07-15) Copyright © Huawei Technologies Co., Ltd. 68

Table of Contents

Related product manuals