1. Use a wrench to remove the waterproof glands from the cascading terminals
of the battery modules.
2. Install battery module power cables.
3. Use a removal wrench to remove the waterproof glands from the battery
terminals on the power module.
4. Install power cables between the battery modules and power module.
Figure 8-3 Installing battery module power cables
Step 3 Installing battery signal cables.
1. Remove the waterproof gland from the communications terminal of a battery
module.
2. Remove the locking cap and waterproof rubber plug from the
communications terminal housing.
3. Install communications cables for the battery module.
4. Lock the communications terminal waterproof gland.
5. Reinstall the waterproof rubber plug.
6. Tighten the locking cap and secure the signal cables using cable clips.
Step 4 Install communications cables for other battery modules in sequence.
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1) 8 Electrical Connection
Issue 01 (2022-07-15) Copyright © Huawei Technologies Co., Ltd. 76