EasyManuals Logo
Home>Hypertherm>Welding System>Powermax 85

Hypertherm Powermax 85 Service Manual

Hypertherm Powermax 85
248 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #133 background imageLoading...
Page #133 background image
TroubleshooTing and sysTem TesTs
powermax
65/85
Service Manual 5-7
Troubleshooting preparation
The complexity of the circuits requires that service technicians have a working knowledge of inverter power supply
theory. In addition to being technically qualified, technicians must perform all testing with safety in mind.
If questions or problems arise during servicing, call the Hypertherm Technical Services team listed in the front of this
manual.
Test equipment
• Multimeter
• IGBT (insulated gate bipolar transistor) tester (part number 128883)
Troubleshooting procedures and sequence
When performing the troubleshooting procedures:
• Read the Safety and Compliance Manual (80669C) for detailed safety information.
• Refer to Section 6, Component Replacement.
• Refer to Section 7, Parts.
• Refer to Section 8, Wiring Diagrams.
After the problem has been located and repaired, refer to the “Sequence of operation” flow diagram in this section to
test the power supply for proper operation.
Power OFF and disconnected
External inspection
Power ON
Internal inspection
Resistance checks
Troubleshooting guide and Fault
codes sections
Troubleshooting tests

Table of Contents

Other manuals for Hypertherm Powermax 85

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hypertherm Powermax 85 and is the answer not in the manual?

Hypertherm Powermax 85 Specifications

General IconGeneral
BrandHypertherm
ModelPowermax 85
CategoryWelding System
LanguageEnglish

Related product manuals