Install and Set Up the Plasma Power Supply
38 811470 Operator Manual Powermax45 SYNC
1. Make sure that the correct gas inlet fitting is
installed.
CSA models come with an industrial
interchange quick-disconnect nipple
with 1/4 NPT threads . To install,
tighten the fitting to 115 kg·cm
(100 in·lb). The fitting comes with thread
sealant applied.
CE/CCC models come with a British
Pipe Thread adapter G-1/4 BSPP with
1/4 NPT threads . To install, tighten the adapter to 104 kg·cm (90 in·lb)
2. Get an inert-gas hose with the correct internal diameter.
For hoses that are less than 15 m (50 feet), use an internal diameter of 10 mm (3/8 inch)
or greater.
For hoses that are 15 m – 30 m (50 feet – 100 feet), use an internal diameter of 13 mm
(1/2 inch) or greater.
Do not use hoses with an internal diameter less than 10 mm
(3/8 inch). Hoses that are too small can cause problems with cut quality
and cut performance.
3. Connect the gas hose to the gas inlet fitting . Refer to Inlet gas pressure requirements
(while gas is flowing) on page 40.
NOTICE
PTFE TAPE CAN CAUSE CLOGGED VALVES, REGULATORS, AND TORCHES
Never use PTFE tape on any joint preparation. Use only a liquid or paste thread sealant on male
threads.