EasyManua.ls Logo

IBM 6C1 - Page 127

IBM 6C1
377 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 2. Firmware Checkpoints. (continued)
Checkpoint Description Action/ Possible Failing FRU
E443 Generate NVRAM configuration variable
dictionary words.
Suspect a system firmware problem if
this problem persists. Verify that the
system firmware is at the current
release level, update as necessary. See
“Unresolved Checkpoint Problems” on
page 85.
E600 SSA PCI adapter open firmware has run
successfully.
1. Replace the SSA adapter.
2. See “Unresolved Checkpoint
Problems” on page 85.
E601 SSA PCI adapter BIST has been started
but failed to complete after 4 seconds.
1. Replace the SSA adapter.
2. See “Unresolved Checkpoint
Problems” on page 85.
E602 SSA PCI adapter open firmware has
started.
1. Replace the SSA adapter.
2. See “Unresolved Checkpoint
Problems” on page 85.
E603 SSA PCI adapter BIST has completed
with an error.
1. Replace the SSA adapter.
2. See “Unresolved Checkpoint
Problems” on page 85.
E604 SSA PCI adapter BIST and subsequent
POSTs have completed successfully
1. Replace the SSA adapter.
2. See “Unresolved Checkpoint
Problems” on page 85.
E605 SSA PCI adapter BIST has completed
successfully, but the subsequent POSTs
have failed.
1. Replace the SSA adapter.
2. See “Unresolved Checkpoint
Problems” on page 85.
E60E SSA PCI adapter open firmware about
to exit (no stack corruption).
1. Replace the SSA adapter.
2. See “Unresolved Checkpoint
Problems” on page 85.
E60F SSA PCI adapter open firmware has run
unsuccessfully.
1. Replace the SSA adapter.
2. See “Unresolved Checkpoint
Problems” on page 85.
E6FF SSA PCI adapter open firmware about
to exit (with stack corruption)
1. Replace the SSA adapter.
2. See “Unresolved Checkpoint
Problems” on page 85.
Chapter 4. Checkpoints
109

Table of Contents

Related product manuals