1 - 21
IPN 074-505-P1E
IC6 Operating Manual
1 Confirm that AC line voltage is supplied and proper for the IC6.
2 Confirm that the back panel (main) AC switch is in the ON position.
3 Press the ON/STBY button on the front panel. A green pilot light should be seen
next to the power switch.
4 The fan at the back of the IC6 should be exhausting air.
5 After the initial temporary boot-up screen which can be viewed in Maintenance
Sys Status, see section 12.8 on page 12-22, the LCD monitor will display an
image similar to the one shown in Figure 1-1.
Figure 1-1 Operate Screen