OW70L-Dac - OneWeb LEO User Terminal
56
Chapter 11. Appendix
11.1 Appendix A. Pre-Installation Checklist
This pre-installation checklist describes important considerations before installing the UT. It must be
completed by the certified installer to install in a safe location. Please fill out the general information below.
Date of Survey:
Date of Install (If different from installation date):
Installer Information
• Company Name:
• Installer’s Name:
• Contact Phone Number:
• Address:
• Email:
Customer Information
• Organization Name:
• Customer Name:
• Phone Number:
• Address:
• Email:
• Site Location (Lat / Long.):
• UT Type Being Installed (w. CNX):
The following checklist is to be completed by the Installer.
Building / Site checklist
Check Item Result
The proposed antenna mount type is checked. (Roof Mount / Ground Mount / Ground Level
Pole Mount / Pole Mount Bolted to Wall / Custom Mount / Etc.)
(Fill out)
The location of the site is checked. (Urban / Semi-urban / Rural / Remote) (Fill out)
The building external wall composition is checked. (If mounted on the building) Yes / No / N/A
The line-of-sight of the antenna is checked for radiation safety. Yes / No / N/A
The safety from unauthorized access is checked. Yes / No / N/A
The roof space/floor space availability based on mount type is checked. Yes / No / N/A
The roof/soil composition based on mount type is checked. Yes / No / N/A
The lightning protection availability is checked. Yes / No / N/A
Expected Obstructions / Possible Interference checklist
Check Item Result
The field of view to satellite constellation is checked. Yes / No / N/A
The no interference with RF transmitters is checked. Yes / No / N/A
The no interference by high voltage lines, power cables, and telephone cables is checked. Yes / No / N/A
The no other possible sources of interference are checked. Yes / No / N/A
The map of no obstruction is checked. (Also updated into UT configuration as an array of
AZ, EL coordinates.)
Yes / No / N/A