EasyManua.ls Logo

JRC JMA-5208HS - Page 443

JRC JMA-5208HS
540 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.4 REPLACEMENT OF MAJOR PARTS
ņ42
8
yyyy
yyyy
Stay
Step 11: Close the upper housing.
Before closing the upper housing, check that
the packing has no abnormality, such as
deformation or cracks.
Also, remove foreign material and dust if
attached.
Close the upper housing while pulling the
center of the stay.
If any hexagonal bolt is not tightened enough
or is loosened, the waterproof performance may
be deteriorated. Be sure to tighten all bolts
with specified torque (120 to 150kgf·cm).
When closing the housing, be careful
that the cables are not caught.
When closing the upper housing, always
pull the center of the stay. Otherwise the
stay may be broken.
After the work, turn "ON" the safety switch.
This completes the magnetron replacement procedure.

Table of Contents

Other manuals for JRC JMA-5208HS

Related product manuals