Table 8: Site Preparation Checklist for SRX340 Services Gateway
Installation (continued)
NotesDatePerformed By
Additional
InformationItem or Task
“SRX340
Services
Gateway
Cabinet Size
and Clearance
Requirements”
on page 31
Verify that your cabinet
meets the minimum
requirements.
“SRX340
Services
Gateway
Cabinet Airflow
Requirements”
on page 31
Plan the cabinet
location, including
required space
clearances.
Cables
•
Acquire cables and
connectors.
•
Review themaximum
distance allowed for
each cable. Choose
the length of cable
based on the distance
between the
hardware
components being
connected.
•
Plan the cable routing
and management.
Related
Documentation
General Site Installation Guidelines for the SRX340 Services Gateway on page 22•
General Site Installation Guidelines for the SRX340 Services Gateway
The following precautions help you plan an acceptable operating environment for your
SRX340 Services Gateway and avoid environmentally caused equipment failures:
•
For the cooling system to function properly, the airflow around the chassis must be
unrestricted. Allow sufficient clearance between the front and back of the chassis and
adjacent equipment. Ensure that there is adequate circulation in the installation location.
•
Follow the ESD procedures to avoid damaging equipment. Static discharge can cause
components to fail completely or intermittently over time. For more information, see
“Preventing Electrostatic Discharge Damage to the SRX340 Services Gateway” on
page 107.