EasyManua.ls Logo

Keysight ENA Series - Page 210

Keysight ENA Series
217 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
210 Keysight E5092A ENA Series Configurable Multiport Test Set
Post-Repair Procedures
Post-Repair Procedures
6-
Switch 9 (20GHz
SPDT Pin Switch
Module)
(P9397-60001)
Not adjustment
needed
Perform the following performance tests.
- Write SN
- Load Match, Insertion Loss and
Isolation Test for Switch 9 (SPDT, 9COM,
9A and 9B)
- LED Check
- DCBUS Check
Switch 10 (20GHz
SPDT Pin Switch
Module)
(P9397-60001)
Not adjustment
needed
Perform the following performance tests.
- Write SN
- Load Match, Insertion Loss and
Isolation Test for Switch 10 (SPDT,
10COM, 10A and 10B)
- LED Check
- DCBUS Check
Switch 1 (20GHz
SP4T Pin Switch
Module)
(P9398-60001)
No adjustment
needed
Perform the following performance tests.
- Write SN
- Load Match, Insertion Loss and
Isolation Test for Switch 1 (SP4T, Port1,
1A, 1B, 1C and 1D)
- LED Check
- DCBUS Check
Switch 2 (20GHz
SP4T Pin Switch
Module)
(P9398-60001)
No adjustment
needed
Perform the following performance tests.
- Write SN
- Load Match, Insertion Loss and
Isolation Test for Switch 2 (SP4T, Port2,
2A, 2B, 2C and 2D)
- LED Check
- DCBUS Check
Table 6-1 Post-Repair Procedures
Replaced
Assembly or Part
Required
Adjustments
Correction Constants
(CC)
Verification

Table of Contents

Other manuals for Keysight ENA Series

Related product manuals