328
OK
C
23.7
°C
18.0
°C
13 : 38 Ven 07 Gen
OFF
+3
+2
+1
-1
-2
-3
OFF
+3
+2
+1
-1
-2
-3
OFF
+3
+2
+1
-1
-2
-3
C1 C2
1
1 2 3 4
2 43
C1 C2
1
1 2 3 4
2 43
C1 C2
1
1 2 3 4
2 43
C1 C2
1
1 2 3 4
2 43
HC4695
HS4695
L4695
N4695
NT4695
AM5875HD4695
BUS
Base
Removable
front cover
Removable system
The central unit is made up of a base for the connection to the system bus cable and a
removable front cover with batteries. The system so formed lets the user perform the
programming operations and replace the batteries easily.
Conguration
Dierently from the 99 zone version, the 4 zone ush mounted central unit must
be congured. This central unit is tted with an integrated temperature probe, and
therefore it must be congured. The conguration sockets on the back of the central unit
are in fact intended and reserved for the integrated probe. They are: ZA, ZB and SLA.
The ZA and ZB sockets must always be used for the conguration operations, connecting
two congurators that identify the address, and the number of the zone controlled by
the probe itself. It is not necessary to start with zone 01, although it is fundamental
that the values of the subsequent zones are immediately after those of the central unit
itself. The conguration procedure requires the completing of the operations using the
“Conguration” menu of the central unit, and the activation of the “Learning” function.
In fact, the search within the system is performed on 3 zone addresses that follow the
one assigned to the central unit itself. The actuators controlled by the probes must be
congured with the same zone address.
Socket Function Congurators
ZA zone address 0 – 9
ZB zone address 0 – 9
SLA Master mode 0 – 8
Zone 13
probe
Zone 14
probe
Zone 15
probe
Power supply
Zone 12
central unit
Zone 12
actuator
Zone 13
actuator
Zone 14
actuator
Zone 15
actuator
4-zone central unit
MQ00178-c-EN 29/04/2014