EasyManua.ls Logo

LEMKEN Juwel 8 - Page 47

LEMKEN Juwel 8
116 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Attaching the implement
45
Connect the top link.
The top link must slope upwards towards
the plough during ploughing.
Secure the top link pin (6).
Only use the top link bolt (6) supplied with
the plough.
In hilly terrain, always connect the top link of 6-furrow or 7-furrow
ploughs to the slot so that the top link ideally lies at the front of the
slot during ploughing.
Connect the hydraulic lines (and electri-
cal cables).
During ploughing, switch the hydraulic
system to draft control or mixed control.
See the tractor manufacturer's operating
instructions.
If the implement will be transported on
public roads, mount warning
signs/lighting equipment.
6

Table of Contents

Related product manuals