EasyManuals Logo

Linak Inline LA20 User Manual

Linak Inline LA20
295 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #108 background imageLoading...
Page #108 background image
Page 108 of 295
Recommendations:
Warnings:
Please follow the important LC3 mounting guidelines.
LC3 is for use in push or pull applications, cable outlet from smallest profile (top) or biggest profile (bottom). See top and bottom plate dimensions.
When washing according to IPX6 parameters please notice that the large profile of the LC3 column must be placed upwards (bottom up).
We recommend making a functional test of the application with all accessories connected before putting it into operation.
Regular cleaning is recommended to reduce bacteria and increase the hygiene level
Intended for indoor use only
Not intended for use in harsh environments like e.g. pool environment, marine environment and agriculture buildings with ammonia vapors.
Always check correct assembly after mounting and service to ensure that the cable locks are mounted.
Ensure that the cable cannot be squeezed, pulled or subjected to any other stress or damages.
LC3 is heavy (more than 10 kg). To avoid personal injury and product damage, DO NOT DROP!
Take special precautions concerning 3rd party interfacing. Please contact LINAK for further information.
Do not exceed the max. pull load specified on the label.
Do not add dynamic load when changing between pull and push.
Do not adjust anything during movement or while connected to mains, it can cause personal injury.
To avoid cable interruption and actuator defects make a proper cable installation and inspect regularly for wear,
damage and jarring sound. Defective parts must be replaced.
After service inspection, the application must be tested for correct functionality before it is put into operation,
to avoid misalignment between two columns moving in parallel.
LINAK recommend using a safety nut in medical applications! LC3 has safety nut as standard.
Do not loosen any screws on the LC3, this can cause collapse of the column!
LINAK recommends making regular measurement of Class 1 protective ground conductivity in the application to avoid
a disconnected grounding cable. If there are worn out or defect parts, the complete LC3 must be replaced.
Interconnecting cables must remain plugged in during cleaning to prevent the ingress of water.
Always retract the LC3 column fully to obtain IPX6 protection class.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Linak Inline LA20 and is the answer not in the manual?

Linak Inline LA20 Specifications

General IconGeneral
BrandLinak
ModelInline LA20
CategoryController
LanguageEnglish

Related product manuals