Introduction
A3.02
M20-M601C
en / 12.02.1996 AA000295 2/2
Ĺ
The operators have to work with the necessary care and to keep to the safety notes. The existing
protection and safety devices must not be removed nor changed, and any damage detected must be
immediately reported. Safety devices may only be changed in special cases by personnel who have
received permission to do this from MaK.
The preparations for the first startup are made by the MaK service engineer, who will explain the
plant to the engine room staff in detail. Detail questions are to be settled on site from the operating
instructions and explanations should be noted down in the instructions. After commissioning the
engine, all important data and work should be recorded in either the engine log book or in our ship
management system DIMOS.
Please observe the data and recommendations in your operating instructions together with the
maintenance and servicing measures recommended by us. They are the basis for a long useful life
with a constant degree of economy for your engine installation.
Attention:
After every cleaning of the engine with fat solvent detergents all metallic blank patts must
be protected again slightly with an oil film!
Special care must be taken to ensure that all bearing points affected by the cleaning are
thoroughly lubricated afterwards!