EasyManuals Logo

MAK M20 User Manual

MAK M20
456 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #31 background imageLoading...
Page #31 background image
Initial operation
Fuel system
A3.05.07.00
M20-M601C
en / 11.12.1997 BA000018 1/1
Ĺ
Fuel system
After a long break from service and/or before the initial operation with heavy and destillated fuels
we recommend:
Remove the fuel injectors according to A5.05.07.07.01.nn.
Check the nozzles and opening pressure according to A5.05.07.08.01.nn.
The rule is: heavy fuel - cooled nozzles
distillate fuel - uncooled nozzles
If an engine equipped for heavy fuel, is to be only temporarily run on distillate fuel, it will not
be necessary to fit uncooled nozzles.
Drain the day fuel tank, remove the sludge and refill.
Clean the fuel filter according to A5.05.07.12.01.nn.
Ensure that all cocks and valves are in the correct position.
Vent the fuel system.
Use auxilary fuel pump. In case the day tank is at a higher level and the pump has a bypass
line: open the stop valve at the pump.
Check for smooth operation of the control rack linkages:
Each individual control rack has movement in both directions so as to give perfect operation.
Set all equipment parts of the fuel and nozzle cooling systems into the operating position.
Switch the fuel circulating pump on and check the vent screws, flange connections and
threaded pipe unions for leaks.
Additional preparation work for heavy fuel operation
(see A3.04.07.nn)
Switch on all necessary preheaters for the correct time.
Switch the fuel circulation pump on.
The fuel temperature before the injection pumps is to be checked according to its viscosity
(see A1.06).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the MAK M20 and is the answer not in the manual?

MAK M20 Specifications

General IconGeneral
BrandMAK
ModelM20
CategoryEngine
LanguageEnglish