EasyManua.ls Logo

Manitowoc Grove CD3340B - Page 96

Manitowoc Grove CD3340B
362 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HYDRAULIC SYSTEM CD3340B/YB4411
4-46
Published 04/07/2015 Control # 569-00
pressure for a minimum of 10 seconds. Visually check
for internal and external leakage. No internal or external
leakage is permitted.
5. Fully extend the cylinder rod. Keep the rod port open.
Apply test pressure (Table 4-10) to the base port. Hold
this pressure for a minimum of 10 seconds. Visually
check for internal and external leakage. No internal or
external leakage is permitted.
6. Retract rod and put plugs in the cylinder ports to keep
out dirt during installation.
Installation
1. Install the cylinder on the machine using the correct
mounting hardware.
2. Connect the hydraulic lines.
3. Lubricate the cylinder pivot grease fittings with
recommended grease.
4. Check hydraulic oil level in the hydraulic oil reservoir.
Add oil if necessary.
Reference Only

Table of Contents

Related product manuals