TA80V User Manual
Chapter 4 Pre-operation Test
4.1. TA80V Pre-operation Test Steps
Test Interval Time
The pre-operation test should be carried out in the following cases:
Everyday before the first pet patient uses it
Between each pet patient use
After repair or maintenance, proceed as required
Everyday before the first animal patient uses it .
Each animal patient before use
Check the system:
Power failure alarm test:
Gas supply pipeline testing:
Flow control test:
Installation and testing of evaporator:
Alarm test:
Respiratory system testing:
Ventilator test:
Respiratory System Test:
ventilator test:
Warning
Please do not use this system before reading and understanding the operation and
maintenance manuals of each component.
• All system connections
• All warnings and precautions
• How to use each system component
• Test method for each system component
Before you use the system, you should:
• Complete all tests in this section
• Test all other system components
If the test system fails, please do not use the system. Ask an authorized service representative to
repair the equipment