TA80V User Manual
7.2. Maintenance Overview and Schedule
This timetable is based on the typical situation of using 2000 hours per year as the minimum
maintenance frequency. If the actual use time per year is longer than the typical situation, then your
equipment should be maintained more frequently.
7.2.1. User Maintenance
Air oxygen concentration calibration ( O2
sensor)
Ventilate the system and open the flow meter to
make the buoy move flexibly to prevent
blockage or adhesion.
Leak test of the bellows integration (see 6.5.2
for the method)
Pure oxygen oxygen concentration calibration
(O2 sensor)
During cleaning and installation
Check if the parts are damaged, replace or
repair if necessary
When the flow velocity waveform is abnormal,
correct the flow sensor.
Replace the O2 sensor (sensor performance
meets requirements within 1 year under typical
usage).
Open the drain valve and replace the absorbent
in the absorption tank.
7.2.2. Maintenance Cycle
This anesthesia machine recommended maintenance intervals for 5 years.
Every five years to be fully tested anesthesia machine and parts replacement.
The anesthesia vaporizer must be fully tested and replaced every 5 years
The absorption circuit must be fully tested and replaced every 5 years