74 Milli-Q® Direct 8/16 System
Maintenance Schedule
message.
Prompted to by an LCD
message or as necessary.
Replacement
Prompted to by an LCD
message.
NOTE:
It is recommended to have a Millipore SAS Service Representative change the UV Lamps
in the system.
The replacement of this lamp involves removing the cover of the system. The
instructions for replacing these lamps are not included in this User Manual. The
instructions are included with the replacement lamp.
Sanitisation
Prompted to by an LCD message
or as necessary.
RO
Cartridge(s)
2
When prompted to by an LCD
message.
Contact Millipore SAS for more
details.
flow rate
New Consumable, Sensor or
change to Feed water.
See ‘Calibrating the flow rate’ for
Check
New Q-Pak® Pack installed, or
when prompted to by an LCD