EasyManua.ls Logo

MIR 250 - Page 182

MIR 250
219 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13. Applications
MiR250 User Guide (en) 11/2020 - v.1.3 ©Copyright 2020: Mobile Industrial Robots A/S. 182
CAUTION
Certain top modules may lead to new hazards and increased risks that cannot
be eliminated or reduced by the risk reduction measures applied by Mobile
Industrial Robots.
Perform a risk assessment according to standard ISO 12100 when mounting
a top module—see Risk assessment on page107.
CAUTION
MiR250 may tip over if weight and payload specifications are not met, risking
damage to equipment or injury to nearby personnel.
Stay within the specifications for weight and the total payload’s center of
gravity—see Payload distribution on page192.
Interface dimensions
MiR250 has five electrical interfaces to communicate with a top module—see Interface
specifications on page199. Figure 13.2 illustrates the dimensions of the top interface covers
and grommets.

Table of Contents

Other manuals for MIR 250

Related product manuals