EasyManua.ls Logo

MWM Acteon - Pre-Assembly Inspections and Measurements

MWM Acteon
215 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Camshaft
6 - 5
9.612.0.006.7160 - 05/04
Pre-Assembly Inspections and
Measurements
Visually check the tappets. Check if there are marks
of excessive waste on the contact area with the cams
of the camshaft.
Attention
During its operation the tappets perform a rotating movement, responsible for a uniform
distribution of the force, uniforming the waste. It must not have waste on only one area.
Visually check tappet lubrication holes.
Attention
The lubrication holes of the tappets cannot be obstructed.

Table of Contents

Related product manuals